In progress2026
Phase 1: SHA MOU and legislative preparation
Defining and developing the framework for a memorandum of understanding (MOU) with the State Highway Administration (SHA), advancing legislative sponsor and authorization discussions, and refining the project overview, phased approach and directional cost logic.
In progress2026–2029
Fundraising and public engagement
Runs alongside the phases: building the administrative and campaign infrastructure (2026), a soft fundraising launch aligned with legislative efforts (spring 2027), a wider public campaign once the project and design are validated (summer–fall 2027), and peak fundraising alongside regulatory approvals and pre-construction planning (2028–2029).
Up next2027
Phase 2: Legislative authorization and site assessment
Maryland legislative authorization and state alignment, engineering and site assessments, and SHA and stakeholder review of site conditions and findings.
Future phase2027–2028
Phase 3: Memorial planning and design development
A memorial design competition and constituent engagement, preliminary memorial design development, and continued stakeholder coordination and project refinement.
Future phase2028–2029
Phase 4: Regulatory review and final design development
Regulatory concept review and approvals, design development, coordination of environmental and historic reviews, and preliminary and final regulatory approvals.
Future phase2029–2031
Phase 5: Construction and dedication
Groundbreaking, construction of the Memorial, dedication and public opening, and putting operations and maintenance in place.
Future phase2031–2034
Phase 6: Semiquincentennial programming
Educational programming, public commemorative activities and a closeout initiative for the Semiquincentennial, the nation’s 250th anniversary.